Major project model








For the major project i had to construct a model of two construction processes. Here it was concrete and steel. You can see the reinforced concrete footing with connection bolts being joined to a steel UB stanchion with base plate. Also the level of the slab floor and wall cladding.

Friday, May 25, 2007


pre cast concrete pannels awaiting construction. crane will need to be used to take from trucks

Site Visit



tilt up concret pannel construction still with supports in place

multi level long span construction

detail of apex joint

knee joint connection showing bolted rafter

Steel portal frame construction

Thursday, May 17, 2007

engineers drawings




birds eye of stanchion and base plate with connection bolts:
plan view of same detail:
UB stanchion and dimensions:

Monday, May 14, 2007


double skin brick wall incorporating roller door

Saturday, May 12, 2007



pad footing detail showing connection bolts and reinforcement with cladding and cleat

pre case concrete pannel construction showing column and apex joint with rafter and purlin

site visit (7/5/07)